Skip to content
Overhead aerial view of the widened I-75 corridor in Sarasota County
Transportation Projects

I-75 Widening from North of Kings Highway to South of Toledo Blade Boulevard, Sarasota County, FL

TLP, serving as a subconsultant, provided roadway design, drainage design and environmental permits for this 7.7-mile widening project. This project widened I-75 from four lanes to six lanes and included widening of the I-75 bridges over N. Raintree Boulevard, N. Yorkshire Street and New Castle Waterway. Drainage design included storm drains, cross drains and stormwater management facilities. The project also included preparation of a Bridge Hydraulics Report, a SWFWMD permit and TMDL analysis.